Client: Local Community School
Location: Northamptonshire
Sector: Education
Project Type: Special Educational Needs (SEN) Modular Unit
Project Duration: 18 months from planning to delivery
Delivered By: RK Modular
Project Overview
RK Modular was commissioned to design, manufacture, and install a dedicated SEN (Special Educational Needs) unit for a local community school.
The goal was to create a tailored, accessible, and regulation- compliant learning space thatsupports inclusive education. Delivered as a full turnkey package, the project demonstrates RK Modular’s capability to manage planning, construction, and handover for complex educational environments.
Scope of Works
Pre-Construction & Planning:
- Planning support provided to achieve full planning permission
- Structural calculations for regulatory compliance
- Chassis assembly designed for modular strength and flexibility
Construction & Services:
- Full groundworks including foundations and site preparation Electrical first and second fix installations
- Plumbing first and second fix, including connections to school utilities
- Heating and water heating systems installed for all-weather comfort
- Air conditioning system installation for climate control
- Fire alarm, intruder alarm, data, and access control system connections
- Electrical connection to existing infrastructure
- Crane hire and transport managed for safe module delivery and positioning

Finishing
- Tape and jointing for internal walls
- Carpet fitting throughout the unit
- Full internal decoration for a bright, welcoming learning environment
Key Challenges
- Planning Support: The client needed help navigating the planning process, which RK Modular supported through consultation, drawings, and compliance documentation.
- Sensitive Use Case: The SEN nature of the unit required thoughtful spatial design and secure, comfortable finishes.
- All-in-One Delivery: From site prep to final touches, RK Modular managed every aspect under one roof to simplify communication and ensure consistency.
Outcomes
- Purpose-built SEN unit delivered to the school on time and fully operational
- Created a safe, inclusive, and accessible learning environment
- Achieved full planning permission with RK Modular’s support
- Positive feedback from school leadership and local stakeholders
Conclusion
This project highlights RK Modular’s ability to deliver sensitive and technically demanding builds for the education sector. Our experience in modular design, compliance, and turnkey delivery ensures that every build meets both functional and community needs.